function makeResponsive(elementId,textTheme,fontSize,fontColor,lineHeight,charSpacing,width) { let style = "font-size:"+fontSize+"vw;color:"+fontColor+";line-height:"+lineHeight+";letter-spacing:"+charSpacing+"vw;width:"+width+"vw"; $w(elementId).html = "<"+textTheme+" style="+style+">"+$w(elementId).text+""; }
top of page

Indian Brook Reservoir

Melcar has successfully completed the installation of two 60in (1,524mm) tunnels through glacial till. The Melcar team faced many complications with this project including:

~ Geotechnical conditions - sluffying clay, cemented granite (glacial till), boulders larger than OD of the product pipe.

~ No pit - thrust blocks had to be fabricated and made in the field. This required extensive concrete and piling works to without the axial forces of thrusting the 60in steel tunnel forward.

~Weather conditions - during the course of this project, the North East experienced lower than normal temperatures, exaggerated by splitting winds and excessive freezes.

Because Melcar had to bore from the outside into a pre-cast vault, line and grade requirements had no margin of error.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page
function makeResponsive(elementId,textTheme,fontSize,fontColor,lineHeight,charSpacing,width) { let style = "font-size:"+fontSize+"vw;color:"+fontColor+";line-height:"+lineHeight+";letter-spacing:"+charSpacing+"vw;width:"+width+"vw"; $w(elementId).html = "<"+textTheme+" style="+style+">"+$w(elementId).text+""; }